Buckhead Residential Pad
Buckhead, Atlanta - Drive, Pad, and Stormwater Work
Project Type
Residential Prep
Location
Buckhead, Atlanta
Year Completed
2024
Lot Size
1.4 Acres
Scope
Access, Pad, Stormwater
The Project
A Clean Pad on a Sloped Site
The lot needed a practical grading plan that respected slope, tree cover, driveway access, and stormwater flow before the home could come out of the ground.
Benson built the construction entrance, balanced cut and fill, prepared the pad, coordinated drainage, and kept the site stable through changing weather.
The result was a clean, build-ready site with the access and drainage needed for the rest of the construction schedule.

“The pad, drive, and drainage were ready when the builder needed them. Benson kept the field work practical and on schedule.”
The Whitmore Family, Buckhead
Project Gallery
4 of 10 photos shown




Scope of Work
What We Built
Construction entrance and drive approach
Selective clearing and tree protection
Cut/fill grading and compaction coordination
Foundation pad preparation
Temporary and permanent stormwater routing
Final grade handoff for building crews
Methods & Materials
Field Work
Pad Prep
Graded and compacted building pad for foundation layout
Stormwater
Drainage routing shaped around slope and site access
Access
Drive approach and equipment path planning
Stabilization
Erosion-control maintenance through site handoff