Benson Construction
Commercial slab prep with utility conduit, gravel base, curb work, and compact equipment.
ProjectsCommercial UtilitiesMidtown Office Utility Upgrade
Commercial Utilities

Midtown Office Utility Upgrade

Midtown, Atlanta - Live-Building Utility Coordination

Project Type

Commercial Utilities

Location

Midtown, Atlanta

Year Completed

2023

Site Type

Occupied Property

Scope

Utilities, Trenching, Concrete

The Project

Utility Work Without Stopping Access

The property stayed active while utility and site repairs were underway, which meant access, safety, and daily coordination mattered as much as production.

Benson phased trenching, backfill, concrete repair, and drainage tie-ins around tenant access and property-management requirements.

The work kept the building operational while the site infrastructure was brought back into dependable condition.

Midtown Office Utility Upgrade

Benson planned the utility work around an active property and kept us informed every day. Tenants could still get where they needed to go.

James Whitfield, Building Owner

Project Gallery

4 of 18 photos shown

Excavator installing storm drainage pipe beside a framed commercial building on Georgia red clay.
Excavator installing storm drainage pipe on a red clay commercial construction site.
Commercial slab prep with utility conduit, gravel base, curb work, and compact equipment.

Scope of Work

What We Built

Utility trenching and controlled backfill

Storm and roof-drain coordination

Concrete removal and replacement

Traffic and pedestrian access planning

Work-area protection on an occupied property

Inspection support and closeout cleanup

Methods & Materials

Field Work

Utilities

Pipe, bedding, backfill, and tie-in coordination

Concrete

Sawcut, removal, replacement, and finish work

Access

Temporary routes and protected work zones

Closeout

Patching, cleanup, and property handoff

Excavator, roller, skid steer, and service truck staged on a red clay Georgia jobsite.

The Challenge

Keeping a Live Site Open

Tenant access, deliveries, and pedestrian routes had to stay open while utility and concrete work moved through the property. Benson phased the work by area and coordinated daily with building management.

14

Months on live building

23

Tenant suites coordinated

100%

Zero tenant disruption complaints