The Project
Tight Access, Careful Sequencing
The site sat inside an established Atlanta neighborhood with limited staging room, mature trees, and neighbors close on every side.
Benson coordinated demolition support, temporary access, utility trenching, drainage corrections, and erosion-control maintenance around a narrow construction window.
The work was less about flash and more about discipline: keep the site orderly, protect adjacent property, and solve field conditions before they slowed down the build.

“Benson understood the limits of the site from day one. They protected what needed protecting and handled the underground work without drama.”
The Hargrove Family, Ansley Park
Project Gallery
4 of 14 photos shown



Scope of Work
What We Built
Temporary construction access and staging coordination
Demolition and debris-haul support
Erosion-control installation and inspection support
Utility trenching and backfill
Drainage corrections around the structure
Final site cleanup and stabilization
Methods & Materials
Field Work
Utilities
Trenching, bedding, backfill, and utility coordination
Protection
Tree, sidewalk, and adjacent-property protection
Drainage
Swales, tie-ins, and positive drainage corrections
Finish
Site restoration for follow-on trades and landscaping

The Challenge
Working Inside a Tight Neighborhood
The site required daily coordination around access, haul-off, erosion controls, and neighboring properties. Benson sequenced the work so crews could keep moving without crowding the site.
1
Narrow construction entrance
0
Adjacent-property access interruptions
100%
Erosion controls maintained through closeout